Mastercool 69788 Manual. At this point, 69788 will pause and give the operator an opportunity to inject oil. If oil is needed, open the new oil valve and add the needed quantity.

69788 VIDEO MC 2015 FINAL YouTube
69788 VIDEO MC 2015 FINAL YouTube from www.youtube.com

Web find and download user guides and product manuals. Can be programmed to complete a continuous recovery/recycle, vacuum. At this point, 69788 will pause and give the operator an opportunity to inject oil.

The Second Service Alarm ;


R134a high side manual compact. Low side manual compact coupler 14mm. For instance, if the gas available is 9.50 lbs and.

Coupling, Open Only The Relative Valve On The Machine).


• automatic/programmable or manual : Manuals brands mastercool manuals equipment 69788 recovery. This equipment should be used in locations with mechanical ventilation that.

Can Be Programmed To Complete A Continuous Recovery/Recycle, Vacuum.


Web r134a low side manual compact coupler 14mm connection 82934 20. Charging may not run to completion due to pressure balance between the internal tank and the a/c system. If oil is needed, open the new oil valve and add the needed quantity.

Web (69788) 8, 9, 10.


Web at this time it will be necessar y to bottle fill 69788 to approximately 12 to 15 lbs of refrigerant in order to perform a charge. At this point, 69788 will pause and give the operator an opportunity to inject oil. Web after the first alarm is cleared, filters should be purchased to have read y when 69788 requires that the filters be replaced.

Web About This Manual 6 About Your Air Conditioning Recovery/Recycle Service Center 6 Warranty 6 General Information 6 Principles Of Operation 7 Setup 7 The Machine 8 Basic Components.


Web find and download user guides and product manuals. Web mastercool 69788 recovery_recycle_recharge user manual • preliminary operations, automatic procedure • mastercool equipment manuals directory. You have been successfully registered.